Nigeria 22 MW ノコギリ風力発電所

Nigeria 22 MW ノコギリ風力発電所

The ノコギリ風力発電所, located in the Rimi area of ​​Katsina State in northwestern Nigeria, has an installed capacity of 22 megawatts (MW)—enough to meet the electricity needs of approximately 6,000 households. The project comprises 14 General Electric (GE) 1.6 MW wind turbines and supplies electricity to the Nigerian power grid under a 20-year power purchase agreement. PowerWorks manages the project's operations and maintenance (O&M) as well as asset management, achieving an average operational availability of over 98%. Over its 20-year operational lifespan, the electricity generated by the project will avoid or displace harmful emissions associated with fossil-fuel-based power generation, specifically preventing an estimated 3.5 tonnes of sulfur dioxide (SO2), 256 tonnes of nitrogen oxides (NOx), 32 tonnes of fine particulate matter (PM2.5), and 900,000 tonnes of carbon dioxide (CO2). Reducing these emissions mitigates adverse impacts on humans, wildlife, and ecosystems—for instance, by preventing the deaths of 2,900 birds. Furthermore, the wind farm is projected to generate over $40 million in local economic benefits (including both direct and indirect impacts) over the 20-year period; these benefits encompass property taxes, wages for high-skilled positions, land lease payments to landowners and farmers, sales taxes, and expenditures for services procured from local businesses.

South Africa’s 695 MW “Desert Ridge” Wind-Solar-Storage Project

South Africa’s 695 MW “Desert Ridge” Wind-Solar-Storage Project

The proposed "Desert Ridge" integrated wind, solar, and storage project is located near Bedford/Somerset East in South Africa and is currently in the late stages of development, with power sales efforts underway. Six major transmission lines traverse the project site. During its first 16 years of operation, the electricity generated by the project will avoid or displace harmful emissions associated with fossil-fuel-based power generation—specifically, an estimated 96,000 pounds of sulfur dioxide (SO2), 3.7 million pounds of nitrogen oxides (NOx), 1.3 million pounds of fine particulate matter (PM2.5), and 19 million pounds of carbon dioxide (CO2). Reducing these harmful pollutants lowers adverse impacts on humans, wildlife, and ecosystems; for instance, the project is expected to prevent 13 fatalities and 9 heart attacks, while also avoiding the deaths of 71,000 birds. Furthermore, the project is estimated to generate over $1 billion in local economic benefits over its entire lifecycle. It will be constructed immediately adjacent to our existing 22 MW "Sawtooth" wind project.

95 MW アルタモント風力発電所、カリフォルニア州

95 MW アルタモント風力発電所、カリフォルニア州

カリフォルニア州リバモア近くのオルタモント峠にあるアルタモント風力プロジェクトには、920 基の風力タービンで構成され、合計 95 MW の 4 つのプロジェクトが含まれています。このプロジェクトは、Pacific Gas & Electric Company との 4 つの電力購入契約に基づいて運営されています。 PowerWorks Services は、オルタモント パスにある最先端のメンテナンス施設で 20 年間、このプロジェクトを運営および保守してきました。50 人の従業員を必要とし、平均稼働率は 98% 以上で、風力タービンの製造年数は 30 年を超えています。このプロジェクトは 2018 年に廃止され、その後、サミット風力プロジェクトと呼ばれる再発電のために再開発されました。

58 MW サミット風力プロジェクト、カリフォルニア

58 MW サミット風力プロジェクト、カリフォルニア

アルタモント・パス風力プロジェクトを廃止する一方で、GE 2.3 MW 風力タービンを使用した新しい 58 MW 風力プロジェクトに道を拓くために、当社は敷地を再開発し、アラメダ郡での許可を完了しました。このプロジェクト資産は最終的に売却され、現在は Greenbacker Capital が所有しています。プロジェクトは完了し、2021 年に COD が完成しました。

54 MW パンサークリーク風力プロジェクト、イリノイ州

54 MW パンサークリーク風力プロジェクト、イリノイ州

PowerWorks は、イリノイ州パイク郡 (ピッツフィールド近郊) にある 54 MW パンサー クリーク風力プロジェクトの開発活動を完了しました。これには、条件付き使用許可の取得とプレーリー パワー社との 20 年以上の電力購入契約の署名が含まれます。プロジェクトは GE 3.4 MW 風力タービンを設置し、2025 年 2 月に COD に達しました。このプロジェクト資産は 2022 年に Greenbacker Capital に売却されました。